Preparation of quantity surveys and 2D and 3D survey plans

- Schriftliche Aufmaße nach LV/Positionen – transparent, prüffähig und VOB/BGB-orientiert.
- 2D measurement drawings (floor plans, schematic diagrams, site plans) with clear dimensions, references and a clear legend.
- On-site comparison of planned and actual layouts, including photographic documentation with timestamps and allocation to zone/room/distribution cabinet.
- Version control & audit trail – a complete history of changes (audit trail).
- Interfaces & Exports – PDF, Excel.
Real-time digital warehouse

- Interim storage and transfers: controlled internal movements with a complete traceability record.
- Interim storage and transfers: controlled internal movements with a complete traceability trail.
- Cable scraps and waste: accurate, verifiable recording.
- Roles and permissions: warehouse clerk, site manager, project manager – everyone can see and carry out the tasks required of them.
- Export to Excel (by default) and PDF reports, ready to be sent to the building inspectorate/client.
Databases & Analytics

- Digital Construction Log
- Daily logs on services, personnel, equipment, and consumption
- Recording of Downtime, Changes, and Incidents
- A format compliant with the VOB/BGB that has legal probative value
- Distribution boards and circuits, terminal lists, cable routes, etc.
- Seamless tracking “from goods receipt to installation”
- Early warnings in the event of deviations
- Data security and GDPR compliance
Design by Elektroplaning and 3D Models

- Creation of new 2D electrical drawings (floor plans, schematics, site plans)
- 3D/BIM modeling of the mechanical and electrical systems and coordination with other trades
- Wiring diagrams, control panel diagrams, and bills of materials
- Review of existing plans and models (comparison of actual conditions and documentation)
- Preparation of technical details, legends, markings, and design documents
Monitoring der erbrachten Leistungen

- Instant insight into inventory, installations, returns, and the status of the temporary storage facility.
- Overview of subcontractors: hours, services, and approved quantities (measurements/reports).
- Progress by trade (e.g. lighting, network/IT, fire alarm system, access control).
- The project’s ‘financial pulse’ – clearly illustrated by trend charts.
Construction Log with Reference to Plans/BIM

- Daily/Weekly Reports: Personnel, Services, Equipment, and Material Consumption.
- Plan/BIM linkage: Each entry is directly linked to 2D plans or 3D models;
- Behinderungen, Mängel, Nachträge: sauber strukturiert mit Zeitstempeln, Fristen und Belegen.
- Rollen & Freigaben: standardisierte Workflows, Sichtbarkeitsstufen und optionale Freigabeschritte.
- Echtzeit-Verfügbarkeit: Alle Daten stehen in Echtzeit für das Claim-Management zur Verfügung.
- Benachrichtigungen: Hinweise bei Statuswechseln direkt in Microsoft Teams und per E-Mail.
- Exporte: prüffähige PDF-/Excel-Berichte und Vorlagen – auf Knopfdruck.
- Audit-Trail: lückenloser Änderungsverlauf mit Benutzer, Zeitstempel und Inhalt.

