Site diary with plan/BIM linkage
Documentation from the jobsite through handover - structured, clear, and auditable.For large construction and electrical projects where evidence, responsibilities, and quantities must be conducted transparently – in accordance with VOB/BGB and clearly linked to zones / distribution boards / locations..
Key features
- Daily/weekly reports: personnel, executed work, equipment, and material consumption — enriched with photos and weather data.
- Plan/BIM linkage: every entry is directly connected to 2D drawings or 3D models; classification by zone / distribution board / location.
- Stoppages, defects, change orders (Nachträge): cleanly structured with timestamps, deadlines, and supporting evidence.
- Roles & approvals: Standardized workflows, level(s) of visibility, and optional steps of approval.
- Real-time availability: all data is immediately usable for claims management.
- Notifications: status-change alerts directly in Microsoft Teams and via email.
- Exports: auditable PDF/Excel reports and templates — at the click of a button.
- Audit trail: complete change history with user, timestamp, and content.
How it works in practice
- Recording: Services, personnel, equipment, materials, photos and events are recorded on site.
- Link: entries are assigned to zones/distribution boards and linked to the plan/BIM.
- Review & substantiation: workflows guide approvals; exports produce auditable reports in minutes.
Value for every stakeholder
- For clients (investors): For clients: Reliable, audit-proof evidence – accessible at any time.
- For general & subcontractors: clarity on quantities, outputs, and deadlines; fewer follow-up questions.
- For site & project management: standardized documentation, faster audits, and fewer handoffs between systems.
Optionally perfectly networked
In combination with Digital warehouse, measurement plans and the Monitoring a continuous flow of information is created – from the delivery of materials to acceptance..